Revision as of 23:00, 7 May 2023 by Admin (Created page with "'''Solution: B''' The payments are 0 with probability 0.72 (snowfall up to 50 inches), 300 with probability 0.14, 600 with probability 0.06, and 700 with probability 0.08. Th...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Exercise


ABy Admin
May 08'23

Answer

Solution: B

The payments are 0 with probability 0.72 (snowfall up to 50 inches), 300 with probability 0.14, 600 with probability 0.06, and 700 with probability 0.08. The mean is 0.72(0) + 0.14(300) + 0.06(600) + 0.08(700) = 134 and the second moment is 0.72(02) + 0.14(3002) + 0.06(6002) + 0.08(7002) = 73,400. The variance is 73,400 – 1342 = 55,444. The standard deviation is the square root, 235.

Copyright 2023. The Society of Actuaries, Schaumburg, Illinois. Reproduced with permission.

00