BBy Bot
Jun 09'24
Exercise
Bridies' Bearing Works manufactures bearing shafts whose diameters are normally distributed with parameters [math]\mu = 1[/math], [math]\sigma = .002[/math]. The buyer's specifications require these diameters to be [math]1.000 \pm .003[/math] cm. What fraction of the manufacturer's shafts are likely to be rejected? If the manufacturer improves her quality control, she can reduce the value of [math]\sigma[/math]. What value of [math]\sigma[/math] will ensure that no more than 1 percent of her shafts are likely to be rejected?